Project consisted of the furnishing and installation of two (2) 500-gallon grease interceptors and the replacement of all failed waste and vent piping for the main B1 Cafeteria. We also replaced the 100% outside air handling units, heating water convectors and pumps, sewer ejector pumps and controls along with ductwork modifications and corrections. Kent Island Mechanical also coordinated the change of all controls for this equipment to electronic DDC controls.